01 NCAC 41C .0209          REPORTS

Reports must be submitted as follows:

(1)           Progress reports must be submitted quarterly to the State Energy Office during the period implementation or construction is in progress and must include a description of the current status, any problems, and forecast of expectations or deviations from the planned schedule; and

(2)           A final report certified by the technical analyst must be submitted to the State Energy Office upon completion of the project. The report must include a description of the measures implemented; the actual cost of each measure, and the adjusted estimated payback, based on the actual cost.

 

History Note:        Authority G.S. 143-345.18(b)(2a); 143-345.18(b)(3);

Eff. September 1, 2004.